MANAGEMENT SUPPORT CONSTRUCTION DESIGN

 

After determining that a need for new or improved facilities exists, the board, with the guidance of its professional staff, will engage in the following processes:

  1. Select an architect;
  2. Review a site evaluation including an assessment of existing facilities, if any, on the site;
  3. Develop educational specifications recognizing instructional needs and available financial resources;
  4. Review and approve schematic design prepared by architect, assuring that the new or remodeled facility or part of a facility is readily accessible to and usable by individuals with disabilities;
  5. Review a value engineering study and constructability review, and approve construction design including construction estimates;
  6. Call for bids;
  7. Review and approve final construction contract; and
  8. Engage construction management services.

 

The board shall comply with the terms and conditions as specified in the contract between the architect and the school district.

 

Legal References:

RCW

39.35

Short term obligations

42 U.S.C.

26 §§ 12101-12213

Americans with Disabilities Act

WAC

180-30-406

Energy conservation program--Life cycle cost analysis